Reshape & Redesign
Together with bikeparks, skiresorts and trailbuilding companies, I shape durable flowlines, freeride lines, and natural hand-built trails. Every build integrates smart drainage to prevent erosion, along with precise transitions and speed checks to make sure the track rides exactly the way it was intended for the target group.
Versatile Building
Working directly behind the excavator or lead builder, I bring the heavy groundwork to life. I shape precision flowlines with seamless, rhythmic berms and rollers for an effortless ride. For airtime, I fine-tune technical freeride lines, dialing in the drops and lips with the right safety angles. I also finish sustainable, natural trails, cleanly integrating them into the mountain’s raw roots, rocks, and terrain.
Precision Geometry
Working behind the machine, I use a sharp eye to shape perfect transitions, take-offs, and landings. I understand how speed translates to the dirt, ensuring every lip and roller has the exact math and angle needed. By dialing in the geometry precisely, I create features that ride smooth, carry momentum, and feel completely safe
Targeted Design & Adjustments
Working closely with the lead builder or plan, I shape features tailored to any rider skill level. I use my track experience to fine-tune the jumps, berms, and rollers according to the specific assignment. Whether it is a mellow line for beginners or a technical feature for pros, I adjust the shapes perfectly to match the target group and terrain.
Water Management
I shape the dirt to ensure maximum trail durability through drainage and erosion control. I read the terrain to place water bars, ditches, and culverts precisely where they belong. By managing water flow efficiently, I protect the trails from washing away, reduce maintenance needs, and keep the lines running dialed in all weather conditions.
My Latest assignments
References & Past work
| Year | Location/Bikepark | Partner | Trail/Feature | Tasks/contribution | Status |
|---|---|---|---|---|---|
| 2026, Juli | Bikepark Brandnertal | Bikeschool | N/A | Rookiescamp Guiding | ongoing |
| 2026, June | Bikepark Brandnertal | IMM Im Mountain Movement | Tschonny Noxvill- Loischkopfbahn | Pre- season preparation and reshape by hand | finished |
| 2026, June | Sonnenkopf | Klostertaler Bergbahnen | Hikingtrails | Trail Maintenance, Drainage repairs and Debris removal | Finished |
| 2026 , Mai | Dalaas | Private | House Maintenance | Lawn & Meadow Care, Hedge trimming & high pressure Cleaning | ongoing |
| 2026 , Mai | Bikepark Brandnertal | Bikeschool | Rookiescamp Guiding | Finished | |
| 2026, April | Bikepark Brandnertal | IMM Im Mountain Movement | Tschengla Unchained & Tschack the ripper | Pre- season preparation and reshape by hand | Finished |
| 2026, April | Bikepark Arber, DE | Trailtech | Blue Flowline | Pre- season preparation and reshape by hand | Finished |
| 2026, März | Alstätten, CH | Sendas AG | Hiking trail / Shared trail | Trail Maintenance, Drainage repairs and Debris removal | ongoing |
| 2025 Autumn | Bikepark Brandnertal | Bergbahnen Brandnertal | Tschengla unchained & Tschack te ripper | Handshaper during this rebuild and redisgn of the existing trails | Finished |
| 2025 Summer | Bikepark Brandnertal | IMM Im Mountain Movement | Several Trails | In-Season Trail - Maintenance | Finished |