Trail Care
A well-maintained trail is a safe trail. I help bike parks and trail networks stay on top of their trail upkeep. Whether it’s heavy braking bump repair, fixing drainage issues, or keeping the track clear with mowing and debris removal, I deliver the precise hand-work your tracks need.
Debris Removal
Clearing the track from organic and structural hazards. This includes removing fallen branches, loose rocks, leaf buildup, and storm debris to ensure a clean line, prevent punctures, and maximize rider safety.
Vegetation & growth control
Managing the green spaces and overgrowth around the track. This includes mowing high grass to maintain clear sightlines, cutting back brush from the trail corridors, and removing invasive weeds and roots before they damage the dirt surface of berms and lips.
Drainage Repairs
Managing water flow to protect the trail structure. This includes clearing blocked culverts, reshaping drainage ditches, and fixing water bars to guide heavy rainfall away from the track, preventing erosion, puddles, and long-term mud damage
Berm, Take-off & Braking Bump Repair
Restoring and reshaping high-wear trail features. This includes packing and reshaping worn-out berms, rebuilding crisp lips on take-offs, and eliminating heavy braking bumps to restore optimal flow, maximize rider safety, and improve cornering traction.
| Year | Location/Bikepark | Partner | Trail/Feature | Tasks/contribution | Status |
|---|---|---|---|---|---|
| 2026, Juli | Bikepark Brandnertal | Bikeschool | N/A | Rookiescamp Guiding | ongoing |
| 2026, June | Bikepark Brandnertal | IMM Im Mountain Movement | Tschonny Noxvill- Loischkopfbahn | Pre- season preparation and reshape by hand | finished |
| 2026, June | Sonnenkopf | Klostertaler Bergbahnen | Hikingtrails | Trail Maintenance, Drainage repairs and Debris removal | Finished |
| 2026 , Mai | Dalaas | Private | House Maintenance | Lawn & Meadow Care, Hedge trimming & high pressure Cleaning | ongoing |
| 2026 , Mai | Bikepark Brandnertal | Bikeschool | Rookiescamp Guiding | Finished | |
| 2026, April | Bikepark Brandnertal | IMM Im Mountain Movement | Tschengla Unchained & Tschack the ripper | Pre- season preparation and reshape by hand | Finished |
| 2026, April | Bikepark Arber, DE | Trailtech | Blue Flowline | Pre- season preparation and reshape by hand | Finished |
| 2026, März | Alstätten, CH | Sendas AG | Hiking trail / Shared trail | Trail Maintenance, Drainage repairs and Debris removal | ongoing |
| 2025 Autumn | Bikepark Brandnertal | Bergbahnen Brandnertal | Tschengla unchained & Tschack te ripper | Handshaper during this rebuild and redisgn of the existing trails | Finished |
| 2025 Summer | Bikepark Brandnertal | IMM Im Mountain Movement | Several Trails | In-Season Trail - Maintenance | Finished |